Renovation… Unsteady Progress

A few weeks into June, with nothing other than a new wall accomplished, I admitted to myself that having the room ready for July summer classes was a bit ambitious.  Could we have held classes with a boombox on the carpet?  Sure.  Was that the first impression of the new and exciting space I wanted to give my clients. Uh, absolutely not.

So, onto painting.  But wait!  First the other studio location has to have a pipe burst!  And flood the entire space!  And ruin lots of things!  And require insurance inspectors and summer camp last-minute changes and new rugs and potentially ruined marley!  Because chaos!

::deep breath::

So that was a fun weekend of clean-up and tears and then realizing that a pipe bursting during summer and destroying a bunch of old costumes is not the worst thing in the world, even if it is inconvenient and a pain to clean up (imagine if it happened a week before recital and ruined THOSE costumes?!).  It is also just a bit disconcerting to find your entire space covered in water.

 

 


But, back to the matter at hand – oh yeah, I was supposed to be painting, not mopping up water.

And look, a new window!

It turned out, when picking out window sizes that this size was the best one to go with because any bigger was a big jump in expense.

 

Making progress…

To Do List

X Connect spaces

X Build waiting room wall

X Waiting room window

X Paint waiting room

X Paint dance room

– Install dance floor

– Furnish waiting room

– Buy sound system

– Ballet barres in dance room

– Order and install mirrors

Next up… flooring!

One thought on “Renovation… Unsteady Progress

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s